Fire Suppression
September 25, 2009 by Annie · Leave a Comment
Fire suppression systems have been installed in a handful of data suites.
The Fence
The fence around the perimeter of Data Cave is now complete.
Additional UPS Capacity
September 15, 2009 by Annie · Leave a Comment
A few weeks ago, we ordered additional flywheels for our UPS systems.
Blogging Hiatus
September 15, 2009 by Annie · Leave a Comment
I apologize for the lack of blog post this past month. Although, I haven’t been blogging about the progress being made at Data Cave, our crew has been hard at work. I plan to elaborate on most of these items in the next week or two but here are a few things we’ve been working on:
- increasing the capacity of the UPS systems,
- data center cooling (processed water, chillers,etc.),
- completion of the fence around the perimeter,
- installation of additional fire suppression systems for individual data suites,
- additional network configuration,
- testing of monitoring systems, and
- installation and configuration of security systems.
Additionally, we’ve been finishing up the front office area and we’ve also moved into the new facility.
Networking, Chilled Water, and Fencing
August 14, 2009 by Annie · Leave a Comment
Since my last post, we’ve been focused on three projects here at Data Cave.
Internet Connectivity
August 5, 2009 by Annie · Leave a Comment
Last week, Data Cave’s internet connectivity was brought online.
Currently, we have internet connectivity from two separate providers. Both connections are on fiber optic lines. The fiber enters the building in two different locations, from two geographically dispersed areas. Each connection goes a separate direction – currently, one enters the city of Columbus and the other goes to the city Shelbyville.
Finishing Touches
July 30, 2009 by Annie · Leave a Comment
This week, we’ve focused on finishing touches.
Paint Friday
July 24, 2009 by Annie · Leave a Comment
There’s a lot of painting going on at Data Cave, today.
Flywheel UPSs
July 21, 2009 by Annie · Leave a Comment
In late June, the UPSs were set into place, wired up, and installed.
More Front Office Updates
July 20, 2009 by Annie · Leave a Comment
We’ve been hard at work in the front office area.