A Busy Day
February 9, 2009 by Annie · Leave a Comment
It’s been a busy day here at Data Cave.
The electric company was onsite this morning to finish the power line installation. 
A crane was called in to move the wire mesh up to the second floor.

Four bundles of wire mesh on the second floor. The mesh will be used as reinforcement in the concrete. 
Grouting the south wall.

Masons lay block in the northeast corner.

A few excavators are work on connecting the building to city water. 
The concrete crew arrived today. The began prepping the second floor for concrete. 