More of this and more of that

June 4, 2009 by Annie · 1 Comment 

Installation of the fire suppression system continues.

img_1292

Installation of the irrigation system was completed today and a trial run was performed.  Here’s Dave working on the automation for the system.

img_1267

Additional electrical conduit was installed.

img_1300

With the completion of the unistrut installation, more bus duct was installed down the west customer hallway.

img_1297

The downspouts were installed on the east side of the building.

img_1245

The last of the concrete was poured on Wednesday.

img_1309