Lots of progress at the site this week.

The dock leveler was installed.

img_0398

The second floor bay door was installed.

img_0413_2

Now that the concrete for the roof is poured, we’ve begun painting again.

img_0400

Brandon is cutting the concrete on the second floor.  The newly created holes are openings for the HVAC duct work.

img_0401

Here’s a pictures of created openings.

img_0403

Dry walling has begun in the first floor office area.

img_0415

Finally, the windows have been installed.

img_0466