Outside and Inside

May 22, 2009 by · Leave a Comment 

Work is going on both outside and inside the data center.

An irrigation system is being built.

img_0488

Two wells have been drilled for the facilities cooling towers.  Below is a picture of one of the two wells.

img_1045

We’ve begun painting the data suites.

img_1048

The drywall in the first floor office space is coming along nicely.

img_1028

img_1024

Installation of the air conditioning units for the front office area has begun.

img_1031

Ron and Nic have been hard at work connecting the circuit breakers for the flywheel UPS (think battery backup without the battery) to the electrical switch gear.

img_1019

img_1017