The steel workers are still busy at work welding and placing steel pan. I haven’t had the opportunity to get a better view of the work the steel crew is doing but I hope to later this week.

Other work around the site is continuing, as well. Late last week, the overhead doors were installed.

p1138186

p1138187

The past few days, the block crew has focused on the exterior east wall.

p1138159

p1138184

With the drastic temperature drop this morning, it looks like the west wall tent will be put to good use through the end of the week.

p1138174

p1138175