Steel, Doors, Block, and Cold

January 13, 2009 by · Leave a Comment 

The steel workers are still busy at work welding and placing steel pan. I haven’t had the opportunity to get a better view of the work the steel crew is doing but I hope to later this week.

Other work around the site is continuing, as well. Late last week, the overhead doors were installed.



The past few days, the block crew has focused on the exterior east wall.



With the drastic temperature drop this morning, it looks like the west wall tent will be put to good use through the end of the week.



Speak Your Mind

Tell us what you're thinking...
and oh, if you want a pic to show with your comment, go get a gravatar!